LargeSynopticSurveyTelescop
CharacterizationMetric
PipelinesVersion13.0
MichaelWood-Vasey,andJohnSwinbank
DMTR-15
LatestRevision:2017-03-22
Abstract
Thisbriefreportdescribemeasurementsofinterestthat
v13.0oftheSciencePipeline.
ThereportforthepreviousversioncanbefoundinDMTR-14.
LARGESYNOPTICSURVEYTELESCOPE
LARGESYNOPTICSURVEYTELESCOPE
V13.0CharacterizationRepoDMTR-15rtLatestRevision2017-03-22
Contents
1PhotometricPerformance1
2AstrometricPerformance2
3EllipticityCorrelations2
4ComputationalPerformance3
ii
LARGESYNOPTICSURVEYTELESCOPE
V13.0CharacterizationRepoDMTR-15rtLatestRevision2017-03-22
CharacterizationMetricReport:Science
Measuredusingvalidation_data_hsc,whichconsistsof8HSCengineeringimages:r-band,2
i’-band,and2y-band.Measurementsweremadeonindividual,separately-processed,
frameimages:Jointcaland/ormeas_mosaicwerenotrun.
SRDrequired“minimum”valueofeachmetricasdefinedinthe
ment[LPM-17],and,whereavailable,thetargetforthisrelease
agementDevelopmentMilestoneRoadmap[LDM-240].Allvalueswerecomputed
examples/runHscTest.shscriptinthevalidate_drppackage.
1PhotometricPerformance
SubmittedbyMichaelWood-Vasey
procCalRepcorrespondstorequirementOSS-REQ-0275(definedLSE-30).Allotherphoto-
metricperformancemetricsfollowLSS-REQ-0093(LSE-29)andLPM-17table14.
MetricUnit
SRD
Requirement
Release13
TargetValueComments
procCalRep≤1310.0—Needmmag
simulations
PA1(gband)mmag≤812.0—Nodata
PA1(rband)mmag≤812.014.3
PA1(iband)mmag≤812.012.0
PF1(gband)%≤20——Nodata
PF1(rband)%≤20—30.6
PF1(iband)%≤20—18.2
PA2(gband)mmag≤15——Nodata
PA2(rband)mmag≤15—19.6
PA2(iband)mmag≤15—18.2
PA1(uband)mmag≤1213.0—Nodata
PA1(zband)mmag≤1213.0—Nodata
PA1(yband)mmag≤1213.024.3
1
LARGESYNOPTICSURVEYTELESCOPE
V13.0CharacterizationRepoDMTR-15rtLatestRevision2017-03-22
MetricUnit
SRD
Requirement
Release13
TargetValueComments
PF1(uband)%≤20——Nodata
PF1(zband)%≤20——Nodata
PF1(yband)%≤20—36.9
PA2(uband)mmag≤22.5——Nodata
PA2(zband)mmag≤22.5——Nodata
PA2(yband)mmag≤22.5—33.6
2AstrometricPerformance
SubmittedbyMichaelWood-Vasey
ThefollowingmetricsaredefinedfollowingLSR-REQ-0094LSE-29)andLPM-17table18.
MetricUnitSRDRequirementRelease13Target
AM1(r-band)mas≤2050.06.5
AM1(i-band)mas≤2050.010.5
AF1(r-band)%≤20—0.27
AF1(i-band)%≤20—0.69
AD1(r-band)mas≤40—6.5
AD1(i-band)mas≤40—7.5
AM2(r-band)mas≤2050.06.5
AM2(i-band)mas≤2050.010.5
AF2(r-band)%≤20—0.47
AF2(i-band)%≤20—0.67
AD2(r-band)mas≤40—6.6
AD2(i-band)mas≤40—7.3
3EllipticityCorrelations
SubmittedbyMichaelWood-Vasey
2
LARGESYNOPTICSURVEYTELESCOPE
V13.0CharacterizationRepoDMTR-15rtLatestRevision2017-03-22
ThefollowingmetricsaredefinedfollowingLSR-REQ-0097LSE-29)andLPM-17table27.
MetricUnitSRDRequirementRelease13TargetValue
TE1
(r-band)
—≤3×−5101×10−37.9×10
−7
TE1(i-band)—≤3×−5101×10−31.9×10
−6
TE2
(r-band)
—≤3×−7101×10−31.8×10
−6
TE2(i-band)—≤3×−7101×10−33.0×10
−7
4ComputationalPerformance
Computationalperformancemetricswerenotre-measured
significantchangesrelativetothereportonversion12[DMTR-14].
References
[1][LSE-29],Claver,C.F.,TheLSSTSystemsEngineeringIntegrated
SystemRequirements,LSE-29,URL
https://ls.st/LSE-29
[2]
[LSE-30]
, Claver, C.F., The LSST Systems Engineering
LSST
Integrated
System
Requirements
,
LSE-30
,
https://ls.st/LSE-30
[3]
[LPM-17]
, Ivezić, Ž., The LSST Science
LSST
Collaboration,
Science Requirements
2011,
ument
,
LPM-17
,
https://ls.st/LPM-17
[4]
[LDM-240]
, Kantor, J., Juric,
Data
M.,
Management
Lim, K.T.,
,LDM-240
2016,
Releases
https://ls.st/LDM-240
[5]
[DMTR-14]
, Swinbank, J., Bosch, J.,
Characterization
Krughoff, S., 2016,
Metric
ence Pipelines
,
DMTR-14
Version
,
https://ls.st/DMTR-14
12.0
3
Back to top